
Construction Monitoring · Renton
Root Protection During Hydro-Vac Excavation
During trenching at a Renton residential property, our arborist monitored hydro-vac excavation near retained trees and their critical root zones.
The March 2026 field report documents exposed roots, excavation conditions, and supervised pruning of one approximately three-inch root outside the defined critical root zone.
View the construction monitoring report & photos →
















